Case Study — Water Tank Cleaning

Underground water
tank cleaning Welwyn Garden City

Internal cleaning of a 36,000-litre tank beneath a basement car park, intended for a development's grey water supply.

  • Welwyn Garden City, Hertfordshire
  • Confined-space access
36,000L Tank capacity
Below ground Basement car park
Grey water Intended tank use
Completed 3 August 2026
Project Overview

Cleaning beneath the car park

Britteco carried out underground water tank cleaning for Stagg Property Services Ltd at a new-build development on Broadwater Road in Welwyn Garden City, Hertfordshire.

The 36,000-litre tank was below ground within the basement car park. With the development approaching completion, the client needed the tank cleaned for its intended role supplying grey water to toilets.

The original enquiry covered draining and cleaning. Before the cleaning visit was arranged, the client confirmed that the tank had already been drained. The work therefore focused on the internal clean, rather than removing a full tank of water.

Access hatches to an underground water tank in a basement car park in Welwyn Garden City
Tank access openings within the basement car park at the Broadwater Road development.
Client
Stagg Property Services Ltd
Location
Broadwater Road, Welwyn Garden City
Scope
Underground water tank cleaning
Site Requirements

Restricted access.
A clearly defined scope.

Vehicle access, the tank's below-ground position and the site's entry requirements shaped the preparation for the cleaning visit.

Vehicle access

A full-size tanker could not enter the site. The client confirmed that a Transit-sized vehicle could fit within the car park, and Britteco planned attendance with a flatbed van.

Tank already drained

The client reported only a small amount of water remaining at the bottom. The confirmed requirement was cleaning the tank interior, not bulk emptying of its 36,000-litre capacity.

Site entry requirements

The site required pre-attendance online induction and an on-site induction. A confined-space entry permit was also identified as a requirement during the pre-works document review.

Pre-Works Coordination

Planning for below-ground access

Preparation included site-specific Risk Assessment and Method Statements (RAMS), access arrangements and coordination with the client's site team.

The RAMS were shared and revised before attendance. The job record also includes a confined-space entry form, while the site team provided induction instructions for the operatives.

The client confirmed that 110V power was available and that site access opened at 8am. The cleaning visit was agreed for Monday 3 August 2026.

  • 36,000-litre tank capacity confirmed by the client
  • RAMS updated before the cleaning visit
  • Confined-space entry and site induction requirements identified
Access shaft to an underground water tank, showing a ladder and pipe connections
The access shaft, pipe connections and ladder used to reach the below-ground tank.
On Site

Confined-space access and internal cleaning

The team accessed the underground tank through the existing openings and carried out the internal cleaning work.

Site photographs show the tripod and winch positioned over an access hatch, a ladder within the shaft and an operative working inside the tank with a helmet and harness.

The cleaning photographs show deposits being collected from the base of the tank, with material gathered in a container inside the vessel. The work addressed the remaining internal residue after the earlier draining had already been completed.

  • Access through the existing tank openings
  • Internal cleaning and collection of deposits
  • Photographs recording the work and interior condition
Operative cleaning inside an underground water tank, viewed through the access shaft
Internal cleaning in progress, viewed through the tank access shaft.
Photographic Record

Inside the water tank

Internal photographs show the tank surfaces, fittings and cleaning activity beyond what can be seen from the car park access openings.

Interior of an underground water tank showing a central pipe and residue on the base
Interior condition The central pipe, internal surfaces and residue visible on the base.
Interior of an underground water tank with blue walls, an overhead access hatch and cleaning materials
Internal view during the works Blue internal walls and an overhead access opening, with cleaning materials still visible inside the tank.
Project Completion

Cleaning completed.
Recorded on site.

The cleaning job was marked complete on 3 August 2026. The project brought together below-ground access planning, site-specific documentation and internal water tank cleaning at the Broadwater Road development.

Job sheet and photographs

Following the work, the team requested a job sheet with photographs showing the cleaned tank for the customer. The job record includes site photographs and the pre-works documentation correspondence.

  • Underground Water Tank Cleaning
  • Confined-Space Access
  • Internal Cleaning
  • Site-Specific RAMS
  • Photographic Record