Skip to main content

Britteco

Oil Spill Response & Land Remediation UK

Oil Spill Response & Land Remediation for Commercial Tank Sites

Containment, source removal and remediation of oil-contaminated ground at commercial and industrial fuel storage sites — with the waste documentation your insurer, landlord and the Environment Agency will ask for.
Spill
Containment
Source
Isolation
Contaminated
Soil Removal
Licensed
Disposal
Site
Reinstatement
Corroded steel oil tank with heavy surface rust presenting a leak and ground contamination risk
Leak Risk Identified
Sludge and contaminated residue being removed from an open underground oil tank
Source Removal
Vacuum tanker uplifting contaminated fuel and waste from an underground tank for licensed disposal
Licensed Uplift

Oil Spill Clean-Up, Contaminated Land Remediation & Hazardous Waste Removal

When a commercial fuel tank leaks, the problem rarely stops at the tank. Oil tracks along pipework trenches, soaks into the surrounding ground, and can reach drains, watercourses or a neighbouring boundary before anyone notices. Britteco handles the whole sequence — stopping the release, removing the source, dealing with the contaminated ground, and documenting the waste — as one job, under one set of RAMS.

Most of the work we are called to is tank-related: a failed underground line, a corroded base, an overfill, or contamination found during a tank removal that nobody expected. Because our engineers already work on fuel storage systems every day, the same team that cleans and removes the tank also deals with what is underneath it.

Already know the fuel needs uplifting? If the tank contents are the issue rather than the ground, see waste fuel disposal and uplift. This page covers spills, leaks and contaminated ground.

What a Britteco Response Covers

No two contamination jobs look the same. What follows is the full scope we can bring to a site — a given project will use some of it, not all of it.

Containment & Make Safe

Stopping the release and limiting its spread: isolating the tank and pipework, bunding and absorbents, protecting gullies and drainage runs, and making the area safe to work in before anything else happens.

Source Removal

Draining and cleaning the tank, gas-freeing where required, and removing the failed tank or pipework. Contamination cannot be dealt with properly while the thing causing it is still in the ground.

Excavation of Contaminated Ground

Removal of oil-stained soil, backfill and pipework surround from around the tank and along the line runs, taken back to visibly clean material and to the depth the situation requires.

Hazardous Waste Handling

Contaminated soil, sludge, absorbents, PPE, pipework and tank arisings segregated, containerised and removed under duty of care, with consignment notes issued for each load.

Recovery & Recycling

Steel tanks and pipework cut down and sent for recycling rather than landfill; recoverable fuel separated where it is worth recovering, so that only genuine waste is disposed of as waste.

Reinstatement

Clean backfill, compaction and surface reinstatement so the area can be handed back — whether that means a hardstanding, a car park bay or the base for a replacement tank.

Documentation Pack

Waste transfer and hazardous waste consignment notes, photographs of the work in progress, and a written record of what was found and what was removed — the paperwork insurers and landlords ask for.

Specialist Referral

Where a site needs formal ground investigation, monitoring boreholes or a validation report from a qualified geo-environmental consultant, we say so and work alongside that specialist rather than pretending otherwise.

How a Contamination Job Runs

From the first phone call to handing the site back, the sequence is the same. The scale changes; the order does not.

1

Call & Triage

What has been released, roughly how much, how long ago, and what is nearby — drains, watercourses, boundaries, occupied buildings. This determines whether it is an emergency attendance or a planned visit.

2

Contain & Make Safe

Stop the release, protect drainage, isolate the tank and lines, and control access. Nothing is excavated until the source is under control.

3

Site Assessment

Extent of the staining, ground conditions, access for plant, services and buried utilities, and what the surface has to be reinstated to. This is what the quotation is built from.

4

Quotation & RAMS

A written scope with the disposal routes named, method statement and risk assessment, and confirmation of who is notifying whom — insurer, landlord or regulator.

5

Source Removal

Tank drained, cleaned and gas-freed; failed tank and pipework cut out and removed; recoverable fuel separated from waste.

6

Excavation & Removal

Contaminated soil and arisings dug out, segregated and loaded for disposal, working back to clean material and keeping clean and contaminated arisings apart.

7

Reinstatement

Clean fill placed and compacted, surface made good, and the area returned to a usable condition or prepared for a replacement installation.

8

Handover Pack

Consignment notes, waste transfer notes, photographs and a written summary of what was removed — issued together, not chased for afterwards.

Request a Site Assessment

How Oil Contamination Starts on Commercial Sites

Very few contamination jobs begin with a dramatic spill. Most are slow, quiet and only discovered when something else prompts a look — a fuel reconciliation that will not balance, a smell in a drain, a tank replacement, or a buyer's survey. By then the oil has usually had time to travel.

Failed underground pipework

The most common cause we see. A buried steel line corrodes at a joint or a bend and weeps for months. Losses are small enough to be missed on paper but large enough to contaminate a long trench run.

Corroded tank base or shell

Water sitting under a steel tank, or sludge and water inside it, eats the tank from both directions. Failure usually starts at the lowest point, where it is hardest to see.

Overfill and delivery spills

A failed overfill alarm, a vent discharge or an uncoupled hose during delivery. The volume is often modest, but it lands on the surface and runs straight for the nearest gully.

Redundant tanks left in the ground

Tanks taken out of use but never decommissioned still hold residue. Years later the shell fails and releases what is left, often onto a site that has since changed hands or changed use.

Damage during site works

A digger bucket, a post driver or a new service trench through a buried fuel line. The loss starts immediately and often is not noticed until the tank gauge drops.

Fuel theft and vandalism

Lines cut or drain valves left open to siphon fuel. Whatever is left in the tank keeps running out long after whoever opened it has gone.

Regular tank inspections and ultrasonic thickness testing catch most of these before they become a ground contamination problem — which is always the cheaper outcome.

Contaminated Soil & Site Arisings

Once ground is contaminated with oil it stops being soil and becomes a controlled waste. How it is classified, segregated and consigned decides what it costs to deal with — and whether the paperwork stands up afterwards.

Segregate at the dig

Clean arisings and contaminated arisings are kept apart from the first bucket. Mixing them turns a small quantity of hazardous waste into a very large one, and the cost follows the tonnage.

Classify honestly

Waste is described by what it actually is, with the correct EWC code, rather than whatever is quickest to book in. A misdescribed load is the operator's problem and the producer's liability.

Consign every load

Hazardous waste leaves site under a consignment note naming the producer, the carrier and the receiving site. You keep a copy; so do we.

Backfill clean

The void is filled with imported clean material and compacted in layers, so the ground is fit to carry whatever goes back on top of it.

Test rather than assume

Where the classification of the material is unclear, a sample is tested instead of guessed. Over-classifying wastes money; under-classifying creates a liability that stays with you.

Keep the dig tight

Excavation is taken back to clean material and no further. Over-digging inflates the tonnage leaving site without improving the outcome for the ground.

Your Duty of Care Does Not Transfer

Under the Environmental Protection Act, the business that produces the waste stays responsible for it — even after a contractor has driven it off site. That is why the documentation matters as much as the digging.

Registered carrier

Waste is only moved by a carrier registered with the Environment Agency, and only to a site licensed to receive that waste type.

Consignment notes

Hazardous waste consignment notes are raised for each movement and handed over as part of the job, not weeks later.

Photographic record

What was found, what was removed, and what the ground looked like before backfill — photographed and issued with the pack.

Evidence for insurers

A written record of the cause, the scope of the works and the disposal routes, in a form an insurer or landlord can actually use.

Permitted disposal sites

Waste goes to facilities permitted to accept that waste type, and the intended route is named on the quotation before work starts.

Records retained

We keep our copies as well as issuing yours, so a note can be re-issued years later if a sale, a survey or an insurer asks for it.

Request a Quote

Why Sites Call Britteco

Twenty-five years of commercial fuel tank work, and the contamination jobs that come with it.

One contractor, one programme

Tank drain, clean, gas-free, cut out, excavate, dispose and reinstate — handled by the same team, under one set of RAMS, without three trades blaming each other.

Accredited and insured

CHAS accredited, OFTEC registered, APEA and SPA certified engineers working to written method statements on every site.

Straight about scope

If a site needs formal ground investigation or a validation report from a geo-environmental consultant, we say so up front rather than quoting around it.

Live and occupied sites

Schools, depots, hospitals and working industrial premises — phased so the site keeps running, including out of hours where that is the only way.

Nationwide response

Engineers working across the UK, from single-tank sites to multi-tank industrial installations.

Paperwork issued, not chased

Consignment notes, waste transfer notes and photographs handed over with the completed job.

Frequently Asked Questions

Stop the source if you can do so safely — close valves, isolate the line, stop any delivery. Keep the oil away from drains and watercourses using whatever absorbent or bunding is on site. Do not start digging. Then call us on 0800 677 1155 so the site can be assessed before the contamination spreads further. If oil has reached a drain, a watercourse or a neighbouring property, it should also be reported to the Environment Agency.

It is driven almost entirely by volume and access: how much contaminated material has to come out, how deep it sits, whether plant can reach it, what the surface has to be reinstated to, and the disposal route for the waste type involved. Two jobs on identical tanks can differ by an order of magnitude because of ground conditions alone. For that reason we quote from a site assessment rather than over the phone — but the assessment itself will tell you the realistic range quickly.

If oil has entered, or is likely to enter, a drain, a watercourse, groundwater or land beyond your boundary, it should be reported. In England and Wales that is the Environment Agency incident line; Scotland has SEPA and Northern Ireland NIEA. A spill fully contained within your own bund or hardstanding usually does not need reporting, but it does need dealing with. If you are unsure, report it — the consequences of not reporting are far worse than the call.

Oil-contaminated soil is usually classified as hazardous, which means it must be consigned, carried by a registered carrier and taken to a site licensed to accept it. The classification depends on the contaminant and its concentration, so it is confirmed for the material actually removed rather than assumed. Clean arisings from the same excavation are kept separate and dealt with as non-hazardous, which is why segregation at the dig makes such a difference to the cost.

Yes — that is the normal way we work. Draining, cleaning and gas-freeing the tank, cutting it out, excavating the contaminated ground beneath and around it, and reinstating the area are all handled by the same team as a single programme. Where a replacement tank is going back in, the new base can be formed as part of the same works. See underground tank removals for the removal side of that work.

We provide a full record of the works: what was found, what was removed, where it went, and photographs throughout. Formal ground investigation, monitoring boreholes and validation reporting are the work of a qualified geo-environmental consultant, and where a site or a planning condition requires that, we work alongside one rather than claiming to replace them. We will tell you at assessment stage which of the two your situation needs.

Active releases are treated as emergencies and we aim to get an engineer moving the same day. Historic contamination discovered during a survey, a sale or a tank replacement is normally planned in, so it is scheduled around your site rather than rushed. The phone line is answered around the clock on 0800 677 1155.

Found Oil in the Ground?

Tell us what you have found and what is nearby. We will tell you whether it needs an emergency attendance today or a planned visit — and what the realistic scope looks like.