Green bunded fuel dispensing station with hose reels and pumps on a kerbed island at a depot

Case study · Oakham

Fuel tank replacement surveyOakham

A site visit to survey a fuel dispensing point and blue bunded tanks ahead of a three-tank replacement at a depot in Oakham, Rutland.

Oakham · RutlandThree tanks surveyed
3 tanksIn the replacement plan
Site visitCompleted
DispensingFuel point with pumps
7 photosOf the layout

The starting point

Look before you lift.

Replacing one tank is a job. Replacing three on a working depot is a project, and it starts with a survey.

The brief for this Oakham job combined a site visit with plans to remove and replace three tanks. The photos record the layout: a green bunded fuel station with hose reels and pumps on a raised kerbed island, and blue bunded tanks on concrete plinths beside the loading bay doors, with a yellow cabinet and bollards around them.

This write-up covers the completed survey visit. The removal and installation stages are separate records.

Blue bunded tanks on concrete plinths beside a warehouse loading bay
Blue bunded tanks by the loading bay.

The work

What we did.

01

Record each tank

Type, position, base, bund and connections are noted and photographed.

02

Check access

Routes for the lifting vehicle and the new tanks are checked against doors, kerbs and traffic.

03

Plan continuity

The order of work is planned so vehicles can still be fuelled during the changeover.

Why it matters

A depot cannot stop for a tank swap.

If the fuel point is down, the fleet is down.

A survey fixes the sequence: temporary fuel supply, which tank goes first, where the old fuel is held, and when each new tank is commissioned.

It also catches compliance points early, such as bund capacity, impact protection, and drainage near the dispensing area.

Blue bunded fuel tank and yellow cabinet on a plinth outside a warehouse
Tank and cabinet outside the warehouse.

Project photographs

On site.

Fuel dispensing station seen across the depot yard

The result

Survey completed.

The site visit was completed with a full photo record of the tanks and layout.

That record is the basis for the method, programme and price for the replacement.

Project questions

Oakham project questions.

Do you survey before quoting a tank replacement?

For multi-tank jobs, yes. A visit avoids surprises on access, bases and connections.

Can the depot keep fuelling during replacement?

Yes. Work is sequenced and temporary supply arranged where needed.

Do you supply the new tanks?

Yes. We supply, install and commission bunded tanks and dispensing equipment.

Do you cover Oakham and Rutland?

Yes. We work across Rutland, including Oakham.

Project location

More tank work in Rutland

  1. Areas We Work
  2. East Midlands
  3. Rutland
  4. Oakham

Client typeDepot with its own fuel dispensing point beside warehouse loading bays

Same work forParcel hubs, dairy and food distribution fleets, waste collection depots

This project was in Oakham, Rutland. The Rutland page covers towns, typical sites and the environmental rules there, and the East Midlands page shows the wider region.

Planning similar work?

Tell us about your tank.

Send a few photos, the tank size if you know it and the postcode, and we will come back with a method, a fixed price and a date.